2018 Week in Review: Week 3 – Bot Assembly and Testing

With Week 3, the team has decided on a final design for the intake arms on the robot and wired up the cascading elevator. The testing for box delivery was a success, and we have decided on moving forward with linear bearings on the elevator. Next, we plan to work on finalizing the axles and mounting of the elevator, attaching the final iteration of the intake arms, and progressing with the test code for pistons and the elevator.